Spring Gully PCF Village
March IT was engaged to design, supply and install a Wi-Fi solution to the village after the village was commissioned.

Scope
March IT was engaged to design, supply and install a Wi-Fi solution to the village after the village was commissioned.
Our Solution
March IT connected the site via a new high speed fixed wireless link and delivered 30Mbps of bandwidth. As a structured cabling solution was not cost effective, March IT utilised an in-house design for a Microwave Mesh and an outdoor Wi-Fi solution.
The Outcome
The solution provided a secure 4Mbps/4Mbps to each and every room in the village. March IT’s mandate was to deliver a level of service sufficient for every resident to connect with their family from their room, via Skype or FaceTime, simultaneously, without interruption and without exception.
Connect people working in remote places to their families and friends
Improve productivity by providing reliable telecommunications in remote places
Reduce the impact of isolation for those working in remote places
Deliver reliable communications to a site where limited/no 3G service was available