Case study · Renewable Energy · 25 May 2026

Pumped Hydro Project in South East QLD: ProConnect 4G

MarchNet designed and deployed a dedicated ProConnect private LTE network for a pumped hydro project in South East Queensland, delivering reliable mobile connectivity for remote construction operations.

Pumped Hydro Project in South East QLD: ProConnect 4G

A dedicated private 4G LTE mobile network for a major pumped hydro project in South East Queensland, deployed where and when construction needs it across remote and challenging terrain.

Highlights: dedicated, site-controlled private 4G LTE coverage; a coverage pathway from 79 to 223 square kilometres across hilly, forested terrain; RF design completed for 10 additional base stations; field testing and Proof of Concept completed in May 2026

Coverage where the carriers aren’t

The pumped hydro project is a major renewable energy development in South East Queensland, with construction spread across remote and challenging terrain. As work expanded into areas where public mobile coverage was limited or unavailable, reliable mobile data became increasingly important for personnel, contractors and project systems.

The project owner needed a solution that could:

  • Rapidly introduce mobile connectivity into remote work areas
  • Support personnel and project applications
  • Operate independently of carrier rollout schedules
  • Be deployed where supporting infrastructure is limited
  • Integrate with the wider project communications environment
  • Prove its performance through real-world field testing
  • Scale to additional coverage areas

A difficult communications environment

Mountainous terrain, dense vegetation, constantly changing construction areas and limited existing carrier infrastructure meant public mobile services couldn’t provide the coverage or certainty the project required. The need wasn’t simply another internet service. It was a mobile communications platform the project could deploy where and when construction activities required it.

A dedicated mobile network for construction

MarchNet deployed its ProConnect private 4G LTE solution in the upper reservoir construction area, designed around the construction environment rather than relying on public coverage. The deployment included:

  • A private 4G LTE network with dedicated ProConnect radio equipment
  • IP backhaul integration with the project network
  • Off-grid solar and battery power for a remote site
  • Network monitoring and management
  • A scalable architecture for future coverage expansion
Simplified architecture: personnel phones, tablets, laptops and project systems connect through a solar-powered ProConnect private 4G LTE site, and future ProConnect sites, into the project data and communications network alongside offices, Wi-Fi and the DMR Tier III radio network

Rapid deployment

Rather than waiting for a public carrier to justify and build permanent infrastructure, MarchNet designed coverage around the project’s actual needs, placing sites where they deliver the greatest operational benefit.

Integrated, not isolated

ProConnect uses the project data network MarchNet delivered, making mobile coverage another access layer alongside the project’s DMR Tier III two-way radio network.

Tested in the real terrain

Through 2026, MarchNet took the ProConnect deployment through commissioning and a formal Proof of Concept program. Field testing was completed in May 2026, with the network ready for its Proof of Concept demonstration.

Testing assessed the private mobile service at locations across the project environment, including the project offices and surrounding work areas, validating performance in the actual terrain where personnel would use it, not just from theoretical RF predictions.

Five steps: coverage designed around the project, private 4G deployed, integration with the project network, field testing in the real terrain, and expansion designed for 10 additional base stations

Designed to grow with the project

A full RF design study modelled locations, antenna heights, azimuths and sector configurations for 10 additional base stations: a pathway from 79 km² to 223 km² of coverage using shorter structures in extremely hilly, forested terrain. Coverage can follow construction rather than being limited by existing public infrastructure.

Key figures: designed coverage pathway from 79 to 223 square kilometres with 10 additional base stations; field testing and Proof of Concept completed in May 2026; off-grid solar and battery power

The outcome: private mobile, proven in the field

  • Dedicated private 4G LTE connectivity
  • Coverage designed around project requirements
  • Improved connectivity in remote construction areas
  • Integration with existing project communications
  • Independence from public carrier deployment schedules
  • Real-world field validation of performance
  • A scalable model for future coverage expansion

Private mobile fills the gap between Wi-Fi, fixed infrastructure and public carrier services on large infrastructure projects.