Pongamia Village (November 2014)

Pongamia Village Sector Oil & Gas Location Roma, QLD Client Hutchinson Builders 3 weeks Build Time 30Mbps Bandwidth Delivered Scope March IT was engaged to design, supply 30Mbps of bandwidth and install a Wi-Fi solution to the village after the village was commissioned. Our Solution The village had an existing March IT high speed fixed wireless connection and a…

Eurombah Creek GPF Construction Site and Village

Eurombah Creek GPF Construction Site and Village Sector Oil & Gas Location Roma, QLD Client Monadelphous Engineering 8 weeks Build Time 70Mbps Bandwidth Delivered About the Project Monadelphous Engineering (Monadelphous) were contracted by Origin Energy to construct the Gas Processing Facility (GPF), 350 person village, administration and support buildings at the Eurombah Creek site. The construction of…

Rockwood Village (July 2014)

Rockwood Village Sector Oil & Gas Location Chinchilla, QLD Client Laing O’Rourke 4 weeks Build Time 30Mbps Bandwidth Delivered Scope March IT was engaged to design, supply 30Mbps of bandwidth and install a Wi-Fi solution to the village after the village was commissioned. Our Solution As a structured cabling solution was not cost effective, March IT utilised an…

Orana Gas Processing Facility

Orana Gas Processing Facility Sector Oil & Gas Location Roma, QLD Client Laing O’Rourke 6 weeks Build Time 30Mbps Bandwidth Delivered Scope March IT was engaged to supply a remote internet and corporate private data network to a Gas Processing Facility construction site in remote central QLD. Our Solution March IT designed a Carrier Grade fixed…

Turinga Village (March 2014)

Turinga Village Sector Oil & Gas Location Chinchilla, QLD Client Laing O’Rourke 6 weeks Build Time 30Mbps Bandwidth Delivered Scope March IT was engaged to supply a remote internet service, with 30Mbps of bandwidth, and village Wi-Fi to a Construction Village in remote central QLD. Our Solution March IT designed a Carrier Grade fixed wireless network to supply high speed…

Pongamia Village

Pongamia VillageScope March IT was engaged to supply a private data network, with 30Mbps of bandwidth, to the Pongamia Village Office. Our Solution March IT designed a Carrier Grade fixed wireless network to supply high speed services to the site with a two month infrastructure build time. The Outcome The fixed wireless link connects the remote site back to the…

Haywen Gathering Office (December 2013)

Haywen Gathering Office Sector Oil & Gas Location Chinchilla, QLD Client East Coast Pipelines 6 weeks Build Time 20Mbps Bandwidth Delivered Scope March IT was engaged to supply a private data network to a Gas Gathering Site Office and remote internet services, with 20Mbps of bandwidth, to an accommodation village in remote central QLD. Our Solution March IT designed…